Costa Coffee London – Out-of-Hours Double Door Replacement — Central London
    Retail / Hospitality Project

    Costa Coffee London – Out-of-Hours Double Door Replacement

    Severely damaged aluminium double doors replaced overnight with zero trading disruption

    Out-of-hours emergency attendance to replace a severely damaged aluminium double door entrance at a Costa Coffee store in Central London. Existing doors were removed and a new commercial-grade door set was supplied and installed overnight.

    Client

    Costa Coffee

    Sector

    Retail / Hospitality

    Location

    Central London

    Delivered

    2024

    Quick Facts

    Service

    Aluminium double door replacement

    Response

    Out-of-hours overnight install

    Hardware

    Concealed closers & panic furniture

    Resolution

    Store open as normal next morning

    Scope / What We Delivered

    Full out-of-hours replacement of a severely damaged aluminium double door set, including new commercial-grade doors, concealed closers and panic hardware – completed overnight to avoid any impact on trading.

    • Out-of-hours emergency attendance
    • Removal of severely damaged aluminium double doors
    • Frame preparation and levelling
    • Supply and installation of new commercial-grade aluminium double doors
    • Concealed transom closer installation
    • Panic hardware installation
    • Full operational testing and sign-off

    Key Outcomes

    Damaged double doors fully removed
    New commercial-grade aluminium door set installed
    Concealed transom closers and panic hardware fitted
    Zero trading disruption – overnight completion

    Compliance & Working Method

    • Out-of-hours working for minimal disruption
    • Premises made secure throughout the works
    • Clean working in food retail setting
    • RAMS prepared and shared with client
    • Doors tested and signed off before leaving site

    Outcome

    The new aluminium double doors were fully installed, tested and signed off before the morning shift arrived. The store opened for trading as normal with no impact on customer service or revenue.

    Project Gallery

    Exact project details available on request for tender/reference purposes.

    For Commercial Clients

    Speak to our commercial team

    FM teams, main contractors, retail, education and public sector — tell us about the building and we’ll arrange the right next step.

    Accreditations

    CHAS • Constructionline Gold • FENSA

    £10m public liability • RAMS provided • DBS-checked operatives