01 · Overview
NZR was appointed to replace a cracked second floor glazed unit at WTW Westgate in Redhill. The project required high-level access using a Skyjack SJ45 boom MEWP, controlled glass removal, installation of a replacement sealed glazed unit, sealing, local making good, waste removal and coordination with the WTW site management team.
02 · The Challenge
The damaged unit was located on the second floor of an occupied commercial office building. The works required safe MEWP access from the car park, controlled exclusion zones, careful glass handling, clear communication with site management and minimal disruption to staff, visitors and building operations.
03 · Our Approach
NZR planned the works around the live office environment and car park access requirements. The team reviewed the RAMS, set up an exclusion zone, positioned the MEWP safely and accessed the second floor window externally. The cracked glazed unit was removed using controlled glazing methods before the replacement sealed unit was installed, packed, aligned, re-beaded, sealed and checked.
04 · Outcome
The cracked second floor glazed unit was replaced safely and professionally using controlled MEWP access. The works were completed with site coordination, RAMS, access control, sealing, local making good, waste removal and handover to site management. Key Highlights